Snow Beer: Adding QR Code Management to Safety Valves Greatly Lowers Communication Costs Among the People in Charge
CR Snow Breweries (Wenzhou) Co., Ltd. belongs to CR Snow Breweries (China) Co., Ltd. CR Snow is a large-scale brewing and beer business with 23% of China's beer market. It currently has 49 breweries in mainland China with annual capacity of 5.9 million kiloliters and over 30 strong regional brands, holding an advantage in many Chinese markets. Its national brand, Snow Beer, has been named a Chinese famous brand for two terms in a row and has ranked first in national sales for two years running.
Business Background
With nearly 200 safety valves in the whole plant, the daily inspection and installation management easily leaves people sending valves for inspection, removing and installing them, and managing them disconnected from one another and unable to know the specifics, for example:
- Whether, after a safety valve is sent for inspection, the equipment it belongs to is registered and whether it passes inspection;
- Whether after inspection it is installed on the equipment on time and to standard;
- Staff sending valves for inspection have to register the next inspection date on a computer, which is very tedious;
- Each safety valve lacks historical data such as inspections and checks.
On-Site Results
After using CaoLiao QR codes for safety valve inspection and installation, all work records can be filled in by scanning with WeChat, with photo upload supported, and history can be viewed by scanning, which cuts a lot of repeated communication among the people in charge.

- After inspectors finish a check, if the result is abnormal, the valve status changes to abnormal automatically once they scan and fill in the result;
- Staff sending valves for inspection scan on site to see the equipment's basic information and which pressure vessel it was removed from, with no need to ask the removal and installation staff, and fill in the acceptance inspection form directly by scanning with WeChat, with no need to register on a computer;
- Removal and installation staff scan to learn the valve's principle and installation notes and fill in the installation process record, and the workbench generates the next inspection date automatically. Scanning also shows the valve's current status, to avoid installing an unqualified valve;
- Managers scan to see each valve's inspection, installation, and maintenance history, and see all safety valves' running status and the progress of inspection and installation on phones and computers.

On-Site Rollout
PVC hard card signs were made with a hole punched at the top, and tied onto the safety valves with cable ties.