Hangzhou Metro Line 3: Using QR Codes for Digital Project Management

The Hangzhou Xingqiao vehicle depot handles major overhauls of the trains assigned to Hangzhou Metro Line 3 and the parking of some trains, with 52 parking and inspection bays, 5 monthly inspection bays, 3 fixed repair lines, and 9 subsystem projects. The main buildings include the maintenance depot, the operation depot, the main materials warehouse, the main substation, the traction substation, and more. The contract price is 396 million yuan, and completion is expected in May 2021.

file

When the project department was first formed, the young project team held to the idea of combining "Party building and technological innovation", set up a Party member innovation studio, and after many special discussions boldly tried applying QR code technology to every aspect of project management. This is another all-field, all-around technical innovation for the project after the preliminary attempt at QR code traceability at the Ningbo Dongqian Lake depot project, achieving resource information sharing, standardizing the construction management process, ensuring safe production, and cutting cost and raising efficiency.

file

"In the age of internet big data, combining QR code technology effectively with construction production means, on one hand, that files downloaded by scanning a QR code can be saved straight to the phone, so technical staff can look them up anywhere, any time, with equipment inspection and project quality tracked through the whole process. On the other hand, compared with past methods, QR code information spreads quickly and is easy to make, which not only lowers management cost but also greatly raises work efficiency and project management level," the project lead said.

file

The project department starts from the source at the construction site and further connects the data chain between frontline operations and remote supervision, achieving standardized, informatized, green, mechanized, and intelligent management across labor, safety, environment, and materials, and is committed to building a "high-standard, high-quality, high-level, high-tech" brand project. The cross-field integration of "Internet + smart construction site" helps drive the rolling development of the Hangzhou regional market and the company's high-quality development.

file

Walk into the Hangzhou Xingqiao vehicle depot project of China Railway Shanghai Engineering Bureau, and a small QR code "gathers" construction process management, real-name labor registration, engineering equipment inspection, technical briefings, construction plans, safety briefings, and other management materials, putting every management job of the project on the "train" of informatization.

file

file