China Railway 17th Bureau: Entering the Era of "QR Code" Fine Management

Customer Profile​

China Railway 17th Bureau Group was formerly the 7th Division of the Railway Corps, formed in 1952. It now belongs to China Railway Construction Corporation and is a wholly owned subsidiary of CRCC.

The company now holds professional construction qualifications for urban rail transit projects, and also has more than 251 sets of large and medium power machinery and testing equipment matching its production and operation capabilities, with a comprehensive mechanization level of 96% and more than 430 technical personnel of all kinds.

The Problems​

  • Quality control of personnel's dynamic information and key component production processes takes time and effort
  • Information is hard to record, look up, and count
  • Project standardization management is chaotic, and construction equipment management is not in place
  • The whole process of inspection information needs to be recorded and supervised efficiently

On-Site Results​

  • Scan on site to add records, with voice, images, and location information supported
  • View on mobile any time, with information sharing and display supported
  • Log in to the workbench to manage records and view data summary statistics

img/

Project 1: Qianzhangchang Project​

The Qianzhangchang project makes full use of phone self-media applications, placing technical and safety briefings as QR codes in prominent positions at tunnel mouths, so briefing content can be viewed at any time, on-site construction is standardized, and seamless handoff of safety technical briefings for tunnel construction operations is achieved.

img/

Project 2: Dalin Project​

The Dalin project made QR code scanning platforms at tunnel and bridge pier construction sites. Since entering the site, it has set up 30 QR code scanning platforms at tunnel mouths and 62 at bridge piers in total, and a QR code is stuck on every finished steel component before it leaves the factory.

img/

Project 3: Suzhou Rail Transit Line III-TS-01 Project Management Department:​

A paperless record system that fills the construction site with great intelligence.

img/

Project 4: Zhanghu Project​

Since 2016, the Zhanghu project has stuck an oval QR code on every pier after it is built, and scanning it shows the person in charge of construction, process control during construction, concrete strength, and more all on the phone screen, so you can learn the specific construction process information anywhere, any time.

img/

Project 5: Xicheng Project​

The company's philosophy, project introduction, goals and tasks, project products, construction organization plans, work instructions, and other related materials are made into their own special ID cards, becoming the on-site textbook and quietly making standardized construction part of everyone's thinking.

img/

Project 6: Xi'an Airport Line and Metro Line 6 Project​

The construction sites of each work area have QR code display boards, including construction safety rules, technical briefings, and much other content, with not only illustrated text but also rich and varied animated video teaching.

img/

Evaluation​

Scanning codes with a phone is gradually becoming fashionable. QR codes can not only solve payments and many other problems in life but also greatly raise the efficiency and benefits of daily work in project management, and the project management department will keep innovating and improving, using this system more deeply, and introducing application scenarios such as cloud-based project drawings and materials and digital acceptance of materials entering the site, to build a digital construction site.