Nantong No. 2 Construction Group: Applying QR Codes Comprehensively for Fine Project Management
Customer Profile
Nantong No. 2 Construction Group has three projects that won the China Construction Engineering Luban Award in 2016 and 2017. It is a large construction group with a special-grade general contracting qualification for building construction, first-grade qualifications for municipal public works general contracting and for three specialty contracts (electromechanical equipment installation, building decoration, and steel structure engineering), and 12 related qualifications in water conservancy and hydropower, tunnels, environmental protection, railways, highways, bridges, and more, integrating research, construction, and investment with cross-industry, cross-region, diversified operations.
System Value
-
Shared materials: materials that used to sit in filing cabinets and offices are put into QR codes, and employees can take out their phones any time and scan a QR code to get what they need;
-
Information gathered together: information on the project overview, masonry works, waterstop sill construction, waist beam construction, structural column construction, wall rebar construction, plastering construction, construction progress, and other parts is gathered together on the project notice board, for easy information display and lookup;
-
View management: through view management, rebar in the rebar yard is managed in and out, so you can effectively know total historical stock, current stock, and requisition record data.
Display Information
1. Project Overview

2. Construction Technique Briefings

3. Safety Technical Briefings

Inspection Records
1. Equipment Management
In construction, power box management is a routine category on every site and also the place most easily overlooked and prone to problems. By sticking QR codes on power boxes at every level, with responsibility assigned to individuals, the person responsible scans each box's QR code for inspection every day. The safety supervisor only needs to watch the power box missed-inspection rate, driving safety management with data to ensure safe electricity use and civilized construction.

2. Personnel Management
Real-name labor registration is currently the biggest headache in construction. Sticking employee identity QR codes on hard hats not only solves real-name labor registration, but scanning the QR code also shows an employee's basic information, safety education status, qualification certificates, and health status; it can also be used to manage civilized construction: when an employee does something uncivilized such as not wearing a hard hat or safety belt, a supervisor can scan their QR code to add an uncivilized construction record and manage it.

This is Nantong No. 2 Construction's distinctive employee name plate, with an area added on the safety vest for the employee's name plate, to achieve better personnel management.

3. Edge Protection
Edge protection is also a common scenario in construction. Nantong No. 2 Construction creatively borrowed the 5S management idea, divided the construction area into zones, and set up zone management QR codes, and after the daily patrol people scan the QR code to add a safety check record, strengthening edge protection management.

Evaluation
Engineer Wang, the project lead of Nantong No. 2 Construction's Nanjing Xuanwu District Law and Procuratorate Building project, told us: Nantong No. 2 Construction is a company focused on the construction field, and we also keep an eye on how some internet-style thinking is applied in construction. Combining our own management ideas, we applied CaoLiao QR Code's solution creatively, and it helps our informatized and standardized construction management well. CaoLiao QR Code is a good management tool.