Skip to content

Choose an Integration Path ​

Use this table to pick a path: let AI do the work, call APIs from code, sync data out, or connect other apps without code.

Your taskPathWhat you needStart here
Let AI create codes, build forms, query records, and check inspection progressAdmin MCPA CaoLiao account and OAuth authorization for your organizationQuick start
Let AI read the public content of a codeScan-side MCP or A2ANo loginScan-side quick start
Read code content, read and write form records, or query metrics from your own systemAPIOne OpenAPI KeyAPI overview
Only generate or decode a QR code imageQR code image toolsNo authenticationQR code image tools (Chinese only)
Generate QR code labels in bulk from your own systemLabel Generation APIA label style with API access enabledLabel Generation
Notify your system when a new record arrivesWebhook pushA publicly accessible URLData sync
Put all your data in a database for analysis or BIDirect database connectionThe official database, or your own MySQL 5.7Direct database connection
Connect CaoLiao to other apps without codeApp integrationsAn account for the appTencent HiFlow, WeCom, Feishu Multi-dimensional Tables, Tencent Docs

MCP or API ​

  • If AI will make the calls, prefer Admin MCP. It can do more than the API: create codes, create sub-codes in bulk, build forms and recurring tasks, and download labels. See Tools.
  • To submit records to a form or verify certificates, use the API. These two operations are not among the default Admin MCP tools. See Add record and Verify record certificate.
  • You can use both. Let AI build the content through MCP, then have your business system read and write records through the API.

About app integrations ​

These integrations are configured by pointing and clicking in the backend, with no code. For WeCom edition purchasing and common questions, see WeCom edition features.

If you already use the dynamic QR code API v1 ​

The old APIs still work but are no longer updated. New projects should go straight to the API Reference. Existing projects can switch gradually using the migration table.